100×50×7m Timber Steel Factory Kumasi Ghana
Kumasi anchors Ghana’s timber and furniture trade. The Kaase–Asokwa stretch has run the region’s wood processing for sixty years. The
Kumasi anchors Ghana’s timber and furniture trade. The Kaase–Asokwa stretch has run the region’s wood processing for sixty years. The
Greater Accra sits on Ghana’s Gulf of Guinea coast. It is the centre of the country’s growing pharmaceutical manufacturing sector.
Arequipa sits at 2,335 metres above sea level in southern Peru. The city is in one of South America’s most
In December 2025, Xinguangzheng completed a 50x60x8m steel structure printing plant in Santiago Province, Chile. Spanning 3,000 square meters, the
In November 2025, Xinguangzheng built a steel structure in Giza, Egypt, for an espresso coffee production line. Measuring 150 meters
In November 2025, Xinguangzheng delivered a 30x40x7m steel workshop in Borg El Arab City, Egypt. The 1,200-square-meter facility was built
In October 2025, Xinguangzheng delivered two steel structure rolling mill sheds. They are located in Dar es Salaam, Tanzania. The
In May 2025, Xinguangzheng delivered two identical steel workshops in Mauritius. Each workshop measured 20×100×7 m. One was for growing
In February 2025, Xinguangzheng delivered a steel workshop kit to Montevideo, Uruguay. The standard kit measures 30x40x6 meters and covers
In December 2024, Xinguangzheng completed a 100x100x8m steel carpentry workshop in Kampala, Uganda. Spanning 10,000 square meters, the facility supports
In November 2024, Xinguangzheng delivered a large prefabricated steel factory in Riyadh, Saudi Arabia. The building measures 100x150x10m, offering 15,000
In June 2024, Xinguangzheng delivered a 50x100x8m steel structure workshop in Kampala, Uganda. Spanning 5,000 square meters, it includes a
In July 2025, Xinguangzheng built a steel pharmaceutical plant in Lima, Peru. It measured 100x50x20 meters. The plant has four
Before You Go
Live factory · Not a trading company
Direct from our factory — 3D design + full cost breakdown within 24 hours, no obligation.
QC before balance payment — UT weld report + photos sent before you release the remaining payment.
Tell us about your project
Our engineer responds within 24 hours.